D1000 Gen1 – CMU Harnessing Kit

PHLN-3000-0134

Overview

The D1000 Gen1 CMU Harnessing Kit provides all the essential connection components required to integrate Cell Management Units (CMUs) with battery cells in Prohelion’s distributed battery management architecture. This comprehensive kit includes a 60cm ribbon cable with 8 cell voltage sensing connections and 1 integrated temperature sensor with thermistor, along with the necessary connector hardware. The kit simplifies the deployment of CMUs by providing ready-to-use, professionally terminated connections that ensure reliable cell monitoring and temperature sensing in lithium battery pack installations.

Note: This harnessing kit is specifically designed for the D1000 Gen1 CMU system. For applications requiring the latest features and enhanced performance, consider our upcoming D1000 Gen2 system which may require different cabling configurations.

Key Features

  • Complete Connection Solution: All cables and connectors needed for CMU-to-cell integration
  • 8-Channel Cell Sensing: Individual voltage sense wires for up to 8 lithium cells
  • Integrated Temperature Monitoring: Built-in thermistor and temperature sense wire
  • Professional Termination: Factory-terminated ribbon cable connector for reliable connections
  • Optimal Cable Length: 60cm length provides flexibility for various battery pack configurations
  • Plug-and-Play Design: Ready-to-install solution requiring no additional termination work

Kit Contents

  • Ribbon Cable: 60cm multi-conductor cable with 8 cell sense wires + 1 temperature sense wire
  • Thermistor: Precision temperature sensor for accurate thermal monitoring
  • Connector: Factory-terminated ribbon cable connector for CMU interface
  • Professional Termination: All connections properly terminated and tested

Applications

The D1000 Gen1 CMU Harnessing Kit is essential for:

  • D1000 Gen1 CMU installations and deployments
  • Lithium battery pack monitoring system integration
  • Electric vehicle battery management system builds
  • Energy storage system cell monitoring installations
  • Custom battery pack configurations requiring distributed monitoring
  • Replacement or additional harnesses for existing D1000 Gen1 systems

System Integration

The CMU Harnessing Kit integrates with:

  • D1000 Gen1 CMU: Direct plug-in connection via ribbon cable connector
  • Lithium Battery Cells: Individual sense wire connections to cell terminals (1-8 cells)
  • Battery Pack Assembly: Temperature monitoring via included thermistor placement
  • System Harness: Part of the complete D1000 Gen1 distributed BMS cabling infrastructure

Installation Notes

  • Plug-and-Play: No additional termination or soldering required
  • Flexible Deployment: 60cm length accommodates various battery pack layouts
  • Temperature Sensor Placement: Position thermistor for optimal thermal monitoring of cell group
  • Secure Connections: Ensure all cell connections are properly secured and insulated

Documentation

Comprehensive installation guides and technical documentation are available through Prohelion’s documentation portal at: docs.prohelion.com

Support

For technical support, integration assistance, or product inquiries, please visit our support portal where you can find comprehensive resources, submit support tickets, and access our knowledge base.

$43.50

Related Products